Product Detail :
|
Supply of utdaq system, remote terminal unit, cobalt. Preparation equipment lay out, preparation of bill of material, preparation and approval of technical specification of the system, preparation of fabrication drawings, approval of fabrication procedures and QAP, procurement of reqisite materials, fabrication of equipment, piping, inspection, testing, packing, safe delivery to BARC Trombay, erection, providing proper support and working platform, electrical connection, commissioning and documentation of spf-cun purification system. Predespatch inspection, packing supply, safe delivery, installation, commissioning, warranty and training of elector-mechanical universal testing machine.
|